مهندس محسن سيد يعمل كمُحاضِر كورس HVAV ببيت المهندسين منذ عام ٢٠١٨ (دوام جزئي). كما يشغل حالياً وظيفة Senior HVAC Design Engineer في م. مكتب عبد السلام محروس للاستشارات (دوام كامل) منذ عام ٢٠١٤.

قائمة المشاريع:

فيما يلي بعض المشاريع التي عمل بها مهندس محسن سيد كعضو بالفريق او رئيس مجموعة العمل

Nine Hospitals in Ghana

Scope: Chilled Water System in the medical core of each hospital and the rest of it is Split units

Responsibilities: Reviewing the design drawing and correct the mistakes, Preparation of detailed technical specifications and bills of quantities, Shop drawing .

Construction of Basra water supply improvement project in Iraq

Scope: package units in nine buildings and casing on pump motors for separate ventilation.

Responsibilities: cooling load calculation, design HVAC drawings, Preparation of detailed schedule of equipment, Shop drawing. As build drawings.

Hehya Hospital

Scope: Chilled water system (air cooled chillers) 330 TR

Responsibilities: Redesign of all HVAC drawing, Preparation of detailed schedule of equipment, Preparation of detailed technical specifications and bills of quantities. . Reviewing and approving technical submittals and shop drawing, Site supervision.

International Hospital

Scope: Chilled water system (two absorption chillers) 326 TR

Responsibilities: comparison between air cooled system and absorption system, cooling load calculation, design of all HVAC drawing, Preparation of detailed schedule of equipment, Preparation of detailed technical specifications and bills of quantities.

National Bank of Egypt different projects

Responsibilities Cooling load calculation, design of all HVAC drawing, Preparation of detailed schedule of equipment, Preparation of detailed Technical Specifications and bills of quantities. Reviewing and approving technical submittals and shop drawing, Site supervision.

Ghornata building (historical building)

Scope: Packaged units, VRV, and DX system.

Responsibilities: Cooling load calculation, design of all HVAC drawing, Preparation of detailed schedule of equipment, Preparation of detailed Technical Specifications and bills of quantities. Reviewing and approving technical submittals and shop drawing, Site supervision.

Sama Mall in Ktamya

Scope: Chilled water system (four absorption chillers 1000 TR each)

Responsibilities: Cooling load calculation, design of all HVAC drawing, Preparation of detailed Technical Specifications and Bills of Quantities.

Suez Canal Administration buildings (historical building)

Scope: An office building total TR is 170

Responsibilities: Cooling load calculation, design of all HVAC drawing, Preparation of detailed technical specifications and bills of quantities, preparation of priced bill of quantity

Mamar El Morshidy main office building

Scope: Office building Package units water source with two cooling towers 355 TR

Responsibilities: Cooling load calculation, design of all HVAC drawing, Preparation of detailed technical specifications and bills of quantities, reviewing submittals for equipments and materials, site supervision

 

 